Buntop Brownfield Activity System Map
Explore how approved equipment interfaces, useful data models and network boundaries fit together. These fictional examples show the documents and checks a plant team can review before a pilot.
Plan approved read-only telemetry access. Confirm controller load, operating limits and recovery steps with the plant team.
Transforms proprietary field tags into an ISA-95 standard semantic hierarchy using HighByte and report-by-exception MQTT Sparkplug B.
Strict IEC 62443 conduits. Outbound-only TLS 1.3 pushes data to Layer 3.5 IDMZ without exposing Level 1/2 control networks to IT.
Non-Invasive Extraction
Read-only connection architecture preserving deterministic controller scans.
Edge Contextualization
Transforming raw bits and registers into standardized ISA-95 models.
Security & GxP Integrity
Example network boundaries and audit records for review by the site engineering and quality teams.
Select an Operational Node Above to Inspect
Click any node above to inspect concrete engineering execution details.
Examines how this practice reinforces other operational components.
Highlights the common industry revenue stream Buntop deliberately turns down.